Economic Discontinuous Polyurethane Panel Production Line PU Sandwich Panel Making Machine

Product Description

Economic Discontinuous Polyurethane Panel Production Line PU Sandwich Panel Making Machine
Operating principle
The multi-layered laminator is consisted of the press and the rail stands. Two worktables are moving into the press and the other two stay on rail stands. Initially, put the top and the bottom facing sheets inside of mould frames and then do the necessary sealing and mold-release agent applied work. After that, feed the worktables into the press. When worktables inside the press, the mould frame moves out orderly, the other two worktables feed in at the same time. Upon the finish of feeding, the press will close and slant at an angle, waiting for the injection PU raw materials from the PU mixing head into different panels. Meanwhile materials start foaming and curing. At this time, mould frames on worktables moved out can be opened and the finished products can be unloaded to get ready for next production cycle.   

 

Product Parameters

ltemTachnical Parameter
Layering2+2
SpeedAbout15-20min
Loading mold board size3500-1250min
Size of PanelMax3400*1200mm
Capacity8pieces of8800-1400mm panel each hour
Surface roughness of loading mold boardRa=1.6mm
Highe of Opening Mold0-250mm(Customized)
Temperature of loading mold board~60ºCadjustable
Controlling water temperature~95ºCadjustable
Heating mode temperature machine powerAbout 60kw
Water pressure of temperature  controlling0.3Mpa
Mold locking Power2kg/cm2(Customized)
Incline angle range0-8
Moving speed of loading mold board18-20m/min
Htdraulic pressure14-21Mpa
Voltage380V
Input powerAbout 80kw
DimensionAbout 30m*2.5m*3m

Company Profile

Economic Discontinuous Polyurethane Panel Production Line PU Sandwich Panel Making Machine

 

Certifications

Economic Discontinuous Polyurethane Panel Production Line PU Sandwich Panel Making MachineEconomic Discontinuous Polyurethane Panel Production Line PU Sandwich Panel Making MachineEconomic Discontinuous Polyurethane Panel Production Line PU Sandwich Panel Making Machine

Installation Instructions

The initial installation is not included with the professional member. All installation with our team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled.
 
While our professional member arrives at the site for a completed and final installation, two days training course will be provide to the customer for operation and maintenance procedure. The initial installation is provided within 5 working days  . The actual installation days many vary, based on different machine mode and packing lines. Each day of working hour consist at 8 working hours. Any additional day will be charge according to our service fee listed below.
 
When initial installation is being called for our professional member required, the surcharge will be made advance by the purchase at US$100/person/day plus all travel expenses. Travel expenses include documentation fees visa charge); local and destination transportation charges  air, train, ferry, bus, taxi or any means of transportation required to arrive to/from destination); accommodation (minimum of 3 star hotel facility) and 3 daily hot meals.

After Sales Service

All parts are under one Year Warranty with defects from manufacturer. Any other defect caused by human error, mishandling, wear-and tear & any foreseeable conditions will not be covered by this warranty. All electronic parts and component can be guaranteed by original part's manufacturer or our company.

Payment

30% of the total contract amount is to be T/T into assigned account at the period of 5 working days after the Purchase contract is signed.
70% of the balance must to be made via T/T of the remainder balance amount of the purchase contract before the ordered equipment is to be delivered 10 working days prior of the shipment.
We also accept L/C payment, 30% down payment, and 70% L/C at sight

FAQ

Q1. Is Jinxiang Machinery a Manufacturer? 
A1: Yes, We own 2 manufacturing bases and sales center in Jinan.

Q2: If we don't find what we need from your website , What should we do ? Do you make extrusion lines as per customers' specific requirement? t find what we need from your website , What should we do ? Do you make extrusion lines as per customers' specific requirement? 
't find what we need from your website , What should we do ? Do you make extrusion lines as per customers' specific requirement? t find what we need from your website , What should we do ? Do you make extrusion lines as per customers' specific requirement? 
A2: Yes, we can provide bespoke service to customers with specific requirements. You can send the detailed 
requirements by email. We will check if we can develop them. We develop new machinery every month, and some of them may not yet be updated on our website. 

Q3: How do you ensure your machinery and service quality? 
A3: Our machines taking the European standards and follow the Germany type of business, we cooperation with International famous brands Siemens Schneider Flender Omron ABB WEG Falk Fuji etc. Our company continuously
 imports over 1000 international first-class high precision processing equipment such as multistage machining centers,
CNC lathes and CNC milling machines from Korea, Japan etc.  All our processes strictly adhere to CE certification, 
IS09001 management system . And we have 12 months quality warranty time. We testing the machine performances before each delivery. Jinxiang service engineers will always be here for anything you needed.

Q4: How can  I  order and make payments? 
A4: Once clear your requirements and determined extrusion line is ideal for you. We will send technical solutions and Proforma Invoice to you. You can pay via TT bank transfer, LC as you like.

Q5: How long is the delivery date?
A5: Usually it takes about 1 - 6 months depends on different machinery upon receipt of order advance payment.

Q6: What is your Minimum Order Quantity?
A6:  One. We provide both customized extrusion lines and technical solutions. Welcome contact with us for technical innovation or improvements for your future purchasing plan.    

Q7: What is your production capacity?
A7: We produce more than 500 advanced extrusion lines every year world wide. 

A8: What about shipping?
Q8: We can send the small spare parts by air express for urgent matter. And the complete production line by sea
 to save the cost. You can either use your own assigned shipping agent or our cooperative forwarder. The nearest port is QINDAO port, which is convenient for maritime transportation.

Q9: Is there any pre-after sale service?
A9: Yes, we support our business partners by pre-after sale service. JINXIANG has more than 300 technical testing engineers traveling world wide. Any cases would be responded with prompt solutions. We provide training, testing, operation and maintenance service for a life time.

 

 

Related Products